120 DAY COUNTDOWN TO LAUNCH HAS COMMENCED

COPPER OXIDE WALL SLATS

SCREEN SIZE INCREASE UNLOCKED BY LABORIE VERTICAL DISPLACEMENT HACK SIDE RIGHT DRAWING

60 degree dispersion is the only way to handle center channel on a videowall immersive lounge.

CI 250 RRM THX IN-CEILING

 

THE DYNAMIC TRIO OF PIONEERS IN IMMERSIVE WALLSCREEN CINEMA ARE READY TO ASSIST YOU AT A MERE FRACTION OF PREVIOUS BUDGETS. WITH THEIR RAPID DEVELOPMENT 120 DAY PROCESS.

BI DIRECTIONAL BASS-BI HEMISPHERIC ZONED BM READY

SHADE AND CURTAIN PRESET BASED ACOUSTICS

THE CORRECT TOPS SPACING TO ACHIEVE PROXIMITY EFFECTS.

 

SHADE PRESETS AS ACOUSTICAL SCHEME

LUTRON SHADES, CURTAIN TRACK, LIGHTING CONTROL, KEYPADS.

ISOLATION

WENGE LATTICEWOOD SUBWOOFER ARRAY CONCEAL & ROOM END ACOUSTICS